Increased Productivity and Minimized Operational Waste [Case Study 6]
A small-scale manufacturing company was losing $5,000 monthly due to ineffective contractor supervision when the chief engineer was absent. TOECM analyzed the contractor management practices, introduced a comprehensive training program, and implemented Agile best practices with checklists. As a result, the company eliminated the $5,000 monthly waste, increased contractor productivity, and improved overall operational efficiency.